JavaScript is off. Please enable to view full site.
Invitation of public comments for access permission to Fuel Stations, Retails Outlets, etc.
क्रमांक State Subject Issue Date
1551 Punjab Public Comments for Indian Oil- Adani Gas Pvt. Ltd. at NH-1(44) Km ch.66.975, Ch.80.680, ch.81.975, ch.84.600 8" NBCS Pipeline through 14" Casing Pipe (1.11 Mb application-pdf) 02-01-2019
1552 Karnataka Permission for laying of OFC along NH 150A from Km 598/00 to Km 606/670 Kirangur circle to Pandavapura section on LHS by M/s. BSNL Mysore (1.29 Mb application-pdf) 01-01-2019
1553 West Bengal No objection certificate for construction of 765 KV D/C (Hexa-Zebra) Ranchi-Medinipur Transmission Line by POWER GRID Medinipur-Jeerat Transmission Ltd crossing on proposed ROB in between 153 km to 154 km of NH-60 (428.77 Kb application-pdf) 31-12-2018
1554 Andhra Pradesh Permission for laying of 33kv Electrical Overhead line erecting from Km.61/800 to Km63/050 and crossing at Km.63/050 on RHS Hyderabad - Bangalore section on NH-44 in the state of Telangana (158.82 Kb application-pdf) 31-12-2018
1555 Arunachal Pradesh Proposal for granting ROW permission to lay aerial Optical Fibre Cable from Potin (km 0.00) to Ziro (km 53.50) [Km 0.00 at Potin] section of NH-13 in the state of Arunachal Pradesh (594.91 Kb application-pdf) 28-12-2018
1556 Assam Laying of Optical Fiber Cable from kms 36.00 to kms. 65.00 along NH-87 (New NH-109) with total section length of ROW is 29.000 kms in State of Uttarakhand - Permission Reg (594.91 Kb application-pdf) 28-12-2018
1557 Uttarakhand Laying of Optical Fiber Cable from kms. 0.000 (Sitarganj) to kms 26.000 (Khatima) along NH-09 with total section length of ROW is 26.000 kms in State of Uttarakhand- Permission Reg (1.24 Mb application-pdf) 28-12-2018
1558 Uttarakhand Laying of Optical Fiber Cable from kms. 215.500 to kms 256.000 along NH-74 with total section length of ROW is 40.500 kms in State of Uttarakhand- Permission Reg (1.31 Mb application-pdf) 28-12-2018
1559 West Bengal Permission for laying of Gas Pipe along with OFC conduit across NH-60 at ch.259.945 by GAIL(India) Ltd. (390.90 Kb application-pdf) 28-12-2018
1560 Uttarakhand Laying of Optical Fiber Cable from kms. 175.200 (Malakpur Police Chowki) to kms 192.500 (Bhel Tiraha) along NH-58 with total section length of ROW is 17.300 kms in State of Uttarakhand- Permission Reg (1.31 Mb application-pdf) 28-12-2018

Pages