JavaScript is off. Please enable to view full site.
Invitation of public comments for access permission to Fuel Stations, Retails Outlets, etc.
क्रमांक State Subject Issue Date
1321 Rajasthan Laying of pipe line along NH-62 National Highway crossing with one crossing & both side along NH-62 under RUIDP Ph-III contract package No. RUSDP/PALI/01 in the state of Rajasthan (455.71 Kb application-pdf) 28-03-2019
1322 Rajasthan Laying of pipe line on NH-27 Mile Stone between 1139+769 to 1147 and road crossing at two places on chainage 1140+770 in ROW and road crossing in the state of Rajasthan (467.58 Kb application-pdf) 28-03-2019
1323 Odisha Crossing of OCPL pipeline through NH-49 at km 249.272 (126.40 Kb application-pdf) 28-03-2019
1324 Rajasthan OFC from Km. 396.400 to Km 417.018 (RHS) from Km 417.108 to km 433.982 and 2 nos. crossing at km 417.108 7 km 433.982 on NH-71 By BSNL (459.97 Kb application-pdf) 28-03-2019
1325 Uttar Pradesh Proposal for laying optical fiber cable at NH-58 from Sukher Police Station Udaipur (Lat 24.6412 Long 73.71512) to Nathdwara Sukhadia Nagar Road (Lat 24.917427 Long 73.823898) Total-36000 Mtr (as per enclosed SLD) (4.13 Mb application-pdf) 28-03-2019
1326 Rajasthan Submission of NH Crossing case of 220 KV Kishangarh TSS (DFCCIL) over head line at NH-8 between chainage no. 03-04 near village Sawatsar Kishangarh Distt. Ajmer in the state of Rajasthan (458.67 Kb application-pdf) 28-03-2019
1327 Andhra Pradesh Proposal for laying permission of 33KV DC line to TSIIC Chandavelly Industrial Park along the NHAI Road at Kanakmamidi Village from TSPDCL along NH-163 from km 27.300 to 29.500 in the State of Telangana (3.20 Mb application-pdf) 27-03-2019
1328 Punjab Permission for areal installation of OFC from MS-696.580 to 698.620, 707.000 to 712.800, 722.500 to 725.940, 729.640 to 742.900 and 747.640 to 749.300 LHS side total length in 26.200 of NH-27 (Pindwara-udaipur section), ROW applied in the state of Rajasth (209.36 Kb application-pdf) 26-03-2019
1329 Punjab Proposal for Granting of Permission for laying OFC along route Km 117.950 to 159.00 (RHS) of NH-54 in the state of Punjab (208.13 Kb application-pdf) 26-03-2019
1330 Odisha Permission for laying of drainage outlet to Kanjia Nallah to CBC Sakhigopal Campus (Km. 43.400 to Km. 44.000) along the side of NB- 316 (RHS) by Rural Works Division, Puri (10.57 Mb application-pdf) 24-03-2019

Pages