Archive of Invitation of public comments for access permission for Fuel Stations, Retails Outlets, etc.
S.No. State Subject Issue Date
1 Uttarakhand Laying of OFC (Underground) on hill side from Km 100.600 (Majkhali) to Km 120.600 (Gagas) and Km 71.850 (Hotel Management) to Km 72.400 (Pandeykhola Bypass) along NH-87(New NH-109) for Total length of ROW is 20.550 Kms in Champawat & Pithoragarh Districts in the State of Uttrakhand (1.87 Mb application-pdf) 17-11-2021
2 Uttar Pradesh Permission/NOC to lay 6.1km. of 6" dia CS & 125mm dia MDPE Natural Gas Pipeline on Bareilly-Shahjahanpur Road along RHS of NH-30 from chainage 262.000 (Tata Motors) to Chainage No. 268.100 (KEO, Bareilly) in the State of Uttar Pradesh (2.07 Mb application-pdf) 17-11-2021
3 Tamil Nadu NHAI, Madurai Region - PIU, Trichy - Permission for erection of 22 KV AC Over Head Power Supply line across NH road at Km 290/000 in Padalur - Trichy section of NH-45 for M/s Sree Balaji Crusher, Sanamangalam Road, Nedungur Village, Lalgudi Taluk, Trichy District in the State of Tamil Nadu (1.54 Mb application-pdf) 17-11-2021
4 Odisha Rehabilitation & Up gradation of Cuttack- Angul section of NH-42 (New NH-55) to 4-lane in the State of Odisha under NHDP-IIl on EPC Mode Package-ll- ROW permission for laying Optical Fiber Cable by HDD from CPP GATE (Kulad) to CPP Wall near Ambika Bhaban through old road (LHS) (1,017.98 Kb application-pdf) 16-11-2021
5 Karnataka Proposal seeking permission for laying of pipeline for filling of tanks in Yelaburga and Koppal taluks of Koppal District by lifting water from Tungabhadra river for drinking purpose along NH-367 from Km. 1.450 to Km. 26.00 and crossing at Km. 1.450 & Km. 26.00 by Minor Irrigation & Ground Water Development Department, Division Koppal (10.78 Mb application-pdf) 16-11-2021
6 Andhra Pradesh Proposal for Permission for laying Optical Fibre cable (OFC) along the road Nh-42 by M/s Vindhya Telelinks Limited from km 234/900 to km 236/730 (LHS) of NH-42 (Uravakonda-Krishnagiri section) and a crossing (along the road) on (Rayachoti - Angallu section) NH-340 length of 30.00mts, for a total length of 1.830 kms in Chittoor District in the State of Andhra Pradesh (3.64 Mb application-pdf) 16-11-2021
7 Rajasthan Permission for ROW Permission for Water Pipeline Crossing of NH-113 (New NH-56) at (i) Km 196+400, (ii) Km 200+450, (iii) Km_200+750, (iv) Km 204+750, (v) Km 206+500 & (vi) Km 208+780 Sagwa to Godda Section under the work of Cluster Distribution System for 150 Villages of Sajjangarh Block (Pkg-02) under Water Supply Project for 399 Villages and 395 Dhanies of Blocks Kushalgarh and Sajjangarh Dist-Banswara with operation and maintenance for 10 years on single point responsibility turnkey basis in the state of Rajasthan (1.56 Mb application-pdf) 16-11-2021
8 Gujarat Proposal for ROW permission for Overhead Crossing of Highway by 66KV S/C Palanpur to Hebatpur Line CKT-2 with ACSR Panther Conductor under KISAN SURYODAYA YOJNA at Km 603+610 (between Km 603+000 and Km 604+000) in the state of Gujarat (1.38 Mb application-pdf) 16-11-2021
9 Gujarat Proposal for ROW Permission for laying optical fiber cable on NH-27 from Km 562+500 to Km 565+000 and One Crossing at Km 562+500 for total section of 2.5 Kms (Banas Diesel Pump Service Akhol circle to Banas River) in state of Gujarat (1.40 Mb application-pdf) 16-11-2021
10 Uttar Pradesh Proposal for NOC for overhead crossing of 132 KV S/C in Pilibhit to Pilibhit TSS (Traction Sub Station) overhead line on NH-730 at km.6.300, near town Pilibhit in the State of Uttar Pradesh (1.15 Mb application-pdf) 15-11-2021

Pages