Invitation of public comments for access permission to Fuel Stations, Retails Outlets, etc.
S. No. State Subject Issue Date
31 Madhya Pradesh ROW Permission for Execution of the Sleemanabad Carrier Canal Tunnel (Bargi Right Bank Canal) of Bargi Diversion project from RD 104 Km to RD 129 Km on Turn-Key Basis commissioning and testing of the canal system through TBM (975.70 Kb application-pdf) 08-09-2021
32 Tamil Nadu Permission to lay underground Electrical Cable along the road on NH-4 (Maduravoyal to Sriperumbudur Section) from Km 21/000 to Km 18/100 (RHS) - 2900m by Open Trench Method and diagonally across the road from KM 18/100 to Km 18/000 - 70m by Trenchless Method (HDD) for a total length of 2970m in the limits of National Highways by M/s TANTRANSCO, Chennai Development Circle -II (1.03 Mb application-pdf) 07-09-2021
33 Uttar Pradesh Permission for laying of 1100 mm dia pipeline (MS Pipe) across NH-19 (Old NH-02) across Ch.470.911 length 64 mtr. Basant Vihar, Naubasta, Kanpur in the State of Uttar Pradesh (1.79 Mb application-pdf) 07-09-2021
34 Uttar Pradesh Permission for laying of 1200 mm dia pipeline (MS Pipe) across NH-19 (Old NH-02) across Ch.460.213 length 60 mtr. Bhaunti (Near SAIL Plant) Kanpur in the State of Uttar Pradesh (1.07 Mb application-pdf) 07-09-2021
35 Uttar Pradesh Proposal for laying of Overhead Electrical Cable Line of 33 KV from Route-1 Ch. 142.215 to Ch. 147.915 (RHS), on NH-24 (Delhi-Moradabad Road) in the State of Uttar Pradesh (1.64 Mb application-pdf) 07-09-2021
36 Uttar Pradesh Proposal for overhead crossing of National Highway NH-509 by 132KV S/C Babrala-Dhanari TSS Line between km. 160 & 161 (2.41 Mb application-pdf) 07-09-2021
37 Uttar Pradesh Proposal for laying of Underground Electrical Cable Line of 33 KV from Route-1 Ch. 147.915 to Ch. 150.338 (RHS), on NH-24 (Delhi-Moradabad Road) in the State of Uttar Pradesh (1.34 Mb application-pdf) 07-09-2021
38 Uttar Pradesh Proposal for construction of 33 KV Overhead Electricity Line from Saidpur Chunnilal Village to Mudiya Ahmad Nagar on RHS along NH (Km. 249+300 to km. 251+100) and one underground 33 KV Cable Crossing at Saidpur Chunnilal Village (at Km. 249+300) on NH-24 in the State of Uttar Pradesh (2.02 Mb application-pdf) 07-09-2021
39 Uttar Pradesh Permission for laying of underground Gas Pipeline of M/s Baghpat Green Energy Private Limited for 4” Dia of Carbon Steel Pipe from Design Ch. 38+260 to Design Ch. 41+360 (along Right Hand Side of the National Highway) and for 5" Dia of MDPE pipe from design Ch. 40+760 to Design Ch. 41+360 (along Right Hand Side of the National Highway). Across the National Highway with 4" Dia of Carbon Steel Pipe at Design Ch. 38+450 (30m). The total section length for ROW applied for 4" Dia of Carbon Steel Pipe is 3.13Km. (3130m) and for 5" Dia of MDPE Pipe is 0.6Km (600m) on along Meerut-Baghpat Road, National Highway, New NH-334B (Old SH-14) (Total applied length = 3730m) in the State of Uttar Pradesh (2.22 Mb application-pdf) 07-09-2021
40 Maharashtra Permission for laying of Optical Fibre Cable along NH-166 from Km 185.100 Vitthal Patil Polytechnic college Dhamani to Km 189.700 near Rajput Royal Garden Miraj on Kolhapur-Miraj-Sangola-Solapur for a total length of 4.600 Kms (962.23 Kb application-pdf) 07-09-2021

Pages