Invitation of public comments for access permission to Fuel Stations, Retails Outlets, etc.
S. No. State Subject Issue Date
131 Gujarat Proposal for ROW Permission for 7 Nos. of Crossing of 1650mm Dia Water Pipeline at (i) Km 15+500, (ii) Km 16+900, (iii) Km 37+100, (iv) Km 40+500, (v) Km 41+600, (vi) Km 47+190, (vii) Km 49+850 (Total Crossing Length=475m) of NH-8E (New NH-51) by M/s. Gujarat Water Infrastructure Ltd. (GWIL-Barvala) from Budhel-Borda (NC-41), District- Bhavnagar in the state of Gujarat (1.84 Mb application-pdf) 09-12-2021
132 Gujarat Proposal for ROW Permission for laying proposed 6” dia Steel Gas Pipeline along NH-47 (Old NH-59) from Km 190+921 to Km 192+523 (Godhra-Dahod-Indore) from TOP (On proposed 6” dia steel Gas Pipeline) to Shakarnagar, Taluka-Dahod, District-Dahod (Dahod GA) in the state of Gujarat (1.72 Mb application-pdf) 09-12-2021
133 Gujarat Proposal for ROW permission for Overhead Crossing of 220KV/DC Overhead Transmission line across NH-47 (Ahmedabad Godhra Section of Old NH-59) between Km 35+000 and Km 36+000 for 220 KV D/C Kapadwanj Mahemdabad TSS (NHRCL) Line (1.81 Mb application-pdf) 09-12-2021
134 Telangana NHAI - RO Hyderabad - PIU Hyderabad- Proposal for Permission for laying of Natural Gas Pipeline for a total length of 3.46 kM along National Highway from Km.54/300 to km.55/700 (LHS) & Km.55/700 to Km.57/700 (RHS) through Open trench laying and HDD crossing at Km. 55/700 across the National Highway by HDD method on Hyderabad -Vijayawada section of NH-65 in the State of Telangana (9.40 Mb application-pdf) 09-12-2021
135 Maharashtra Four laning of Yavatmal - Wardha (Package-III) section of NH-361 from Km 400.575 to km 465.500 (Design Length -64.925) under NHDP Phase-IV on Hybrid Annuity Mode in the State of Maharashtra- Permission for underground Horizontal Bore for laying of 11KV cable at village Bhari, Tal.- Yavatmal, Dist. Yavatmal Ch. 412.310 crossing the road on Yavatmal - Wardha section of NH-361 in the State of Maharashtra (1.33 Mb application-pdf) 08-12-2021
136 Maharashtra Design, Engineer, Finance, Construction, Operation and Maintenance Chhattisgarh / Maharashtra border - Wainganga Bridge section from km. 405 to km 485 of NH-53 (old NH-6) in the state of Maharashtra under NHDP Phase-III-A on BOT basis - Request for permission for laying Optical Fiber Cable along NH-53 (Old NH-6) from km 485.000 to km 480.000 for total length of 5 km in the State of Maharashtra (1.36 Mb application-pdf) 08-12-2021
137 Kerala NHAI-RO Kerala- Four laning of Thiruvananthapuram bypass from Kazhakuttam-Mukkola(Km.0+000 to Km.26+500) section of NH-47(New NH-66) under NHDP Phase-lll in the State of Kerala-Laying of LT Poles at Km.8+405 and Km.8+450 by KSEB Ltd. (1.24 Mb application-pdf) 08-12-2021
138 Telangana Proposal for laying of OFC by M/s Vindhya Telelinks Ltd from km 37.500 to 73.750 along Sironcha-Atmakur road section of NH-353C in the state of Telangana (932.14 Kb application-pdf) 08-12-2021
139 Maharashtra Proposal for grant of permission for laying of Optical Fiber Cable (OFC) along & across the National Highway at Km 682.000 to Km 683.600 (Kolhapur Corridor), Km 683.600 to Km 684.700 (Satara Corrdidor) Total Length-2.7 Km & crossing at Km 683.600 on NH-48 (Old NH-4) (897.19 Kb application-pdf) 08-12-2021
140 Chhattisgarh Permission for lay Optical Fiber Cable along Maharaja Chowk Manpur to Kohka Chowk, Ms: Kms 103.00 to Ms:Kms115.00 on NH-930, total section length ROW applied for 12.00 Kms in the State of Chhattisgarh (926.16 Kb application-pdf) 07-12-2021

Pages