Invitation of public comments for access permission to Fuel Stations, Retails Outlets, etc.
S. No. State Subject Issue Date
111 Chhattisgarh Proposal for NOC for Overhead Crossing of National Highway (NH-53) by 33KV D/C Transmission Line for evacuation of power for proposed 50MW Solar Power Plant to proposed PGCIL Bay (Mile Stone 290-291) at Vill-Janjgiri, Distt-Durg (C.G) (1.03 Mb application-pdf) 16-09-2021
112 Chhattisgarh Proposal for NOC for Overhead Crossing of National Highway (NH-53) by 220KV S/C Transmission Line for evacuation of power for proposed 50MW Solar Power Plant to proposed PGCIL Bay (Mile Stone 288-289) at Vill-Kumhari Distt-Durg (C.G) (1.04 Mb application-pdf) 16-09-2021
113 Punjab NOC proposal for Access Permission to Proposed Hotel Building on Ambala-Chandigarh Road on NH-152 (old NH-22) at Km 00.831 (RHS) at Village-Pabhat, Tehsil-Derabassi, District-SAS Nagar in the state of Punjab. Regarding Extension of Time (774.71 Kb application-pdf) 16-09-2021
114 Andhra Pradesh Permission for laying of Optical Fibre Cable (OFC) by M/s. Vodafone Idea Telecom Infrastructure Ltd in the stretch from Km. 412.000 to Km. 413.000 on LHS, from Km. 415.000 to Km. 416.500 on RHS & Road Crossings at Km. 412.000 & Km. 415.000 for a total length of 2,620 meters on Hyderabad - Bangalore section of NH 44 in the State of Andhra Pradesh (4.78 Mb application-pdf) 16-09-2021
115 Himachal Pradesh Proposal for grant of permission for laying of gas pipeline by M/s Bharat Gas Resources Ltd along/ across NH-503 Extn. in km 43.495 to 44.832 and across NH chainage in km 43.495 (956.86 Kb application-pdf) 15-09-2021
116 Himachal Pradesh Proposal for grant of permission for laying of gas pipeline by M/s Bharat Gas Resources Ltd along/ across NH-503 Extn between km 43.495 to 44.495 (RHS), km 34.426 to 33.649(RHS), km 33.649 to 33.298 (RHS), km 33.298 to 32.176 (RHS), km 34.783 to 33.780 (RHS), km 33.367 to 33.150 (LHS), km 33.381 to 36.437 (RHS), km 36.437 to 37.233 (RHS), km 35.957 to 36.381 (RHS), km 36.836 to 37.014 (RHS), for across NH chainage in km 33.780, 33.150 & 36.381 (1.07 Mb application-pdf) 15-09-2021
117 Maharashtra Four laning of Yavatmal - Wardha (Package-III) section of NH-361 from Km 400.575 to km 465.500 (Design Length - 64.925) under NHDP Phase-IV on Hybrid Annuity Mode in the State of Maharashtra - Permission for laying Optical Fiber Cable (OFC) along NH-361 on Wardha - Yavatmal in the following sections Ch. 410/000 to Ch. 477/000 Left Hand Side of the Road (LHS) along the Road for a total length 67 km in the state of Maharashtra (592.80 Kb application-pdf) 15-09-2021
118 Maharashtra Four lanning of Pune Solapur section of NH-65 from Km. 150.050 to Km. 251.325 in the State of Maharashtra under NHDP Phase III Pkg. Il on DBFOT basis: - Permission for laying of underground city sewer pipe line crossing under Central Govt. Sponsored, Amrut Abhiyan Scheme at Km. 249.290 to Km. 249.550 on four lanning of Pune Solapur section of NH-65 in the state of Maharashtra by Solapur Municipal Corporation Solapur (2.92 Mb application-pdf) 15-09-2021
119 Maharashtra Four lanning of Pune Solapur section of NH-65 from Km. 150.050 to Km. 251.325 in the State of Maharashtra under NHDP Phase III Pkg. II on DBFOT basis: - Proposal for fixing of MSEDCL Electric Poles for laying of 11KV Electricity line along Pune Solapur section of NH-65 from Km. 156.600 to Km. 157.230 on LHS in the state of Maharashtra by Maharashtra Jeevan Pradhikaran Division No.1, Pune (2.13 Mb application-pdf) 15-09-2021
120 Karnataka Operation and Maintenance and Fee collection of Elevated Highway Project from Silk Board Junction to Electronic City Junction (Km 8.765 to Km 18.750) section and maintaining 6-laning from Electronic city to Attibele (Km 18.750 to Km 33.130) on Bangalore-Hosur Section of NH-7 - Permission for laying optical fiber cable along NH-44 (Old Nh-7) from Bangalore to Attibele Km 22/800 to Km 32/900(RHS) for a total length of 10.100Kms (1.00 Mb application-pdf) 15-09-2021

Pages