Invitation of public comments for access permission to Fuel Stations, Retails Outlets, etc.
S. No. State Subject Issue Date
81 Uttar Pradesh Request for the permission for laying of underground Gas Pipeline of 12° Dia Steel Pipe and 125mm Dia MDPE Pipe of M/s Indraprastha Gas Limited from Ch. 79.100 (RHS) to Ch. 92.300 (RHS) and across the National Highways at 03 number of locations. The total section length from ROW applied is 13.20 km on along National Highways (Delhi-Muzaffarnagar Road), NH-58 (New NH-334) in the State of Uttar Pradesh (5.79 Mb application-pdf) 21-12-2020
82 Haryana Proposed layout plan for granting the permission to lay 200 mm Diamter natural gas pipeline (CS Pipe) of Haryana City Gas Distribution Ltd along NH-8 (New NH-48) from Km. 33.370 (RHS) to Km, 42,100 (RHS) [Length - 8730M] in District - Gurgaon and State - Haryana (1.01 Mb application-pdf) 21-12-2020
83 Haryana Regarding grant of necessary permission (806.54 Kb application-pdf) 21-12-2020
84 Maharashtra Proposal for grant of permission for laying 400 mm dia DI K-9 Class Raw Water Rising main from T-Point to Paithan area Boundry and Highway crossing at T-Point ( Aurangabad-Paithan NH-752 E from DPR Design Ch. 45+550 to Ch. 46+000) (1.33 Mb application-pdf) 19-12-2020
85 Madhya Pradesh Proposal for NOC for access permission to the proposed fuel station on NH-347 in km. 65, (Ch. 64.426, LHS) Village-Pathrashivlal, Tehsil-Mohkhed & District-Chhindwara in the State of Madhya Pradesh (13.80 Mb application-pdf) 18-12-2020
86 Maharashtra Proposal for Permission for laying of Underground Optical Fiber Cable (OFC) Bhandara - Khat - Ghotitok road NH 247 from Km, 176/600 (Satona T point) to Km, 168/600 ( Ram Ashwat Chowk) in Bhandara Muncipal Limit in the state of Maharashtra (735.76 Kb application-pdf) 18-12-2020
87 Maharashtra Proposal for Permission to carry out Horizontal Direct Drilling (HDD) and open trenching work for laying of OFC Telecom Ducts/Cable (02Nos) along Jurisdiction on Pune Solapur Road NH 65 from 15 Number Canal Hadapsar to Gramsevak Prashikshan Kendra (RHS) Ch 9/90 to 12/200 1 crossing at Ch 12/170 to 0/03 Total Length 2.30 Km (781.38 Kb application-pdf) 18-12-2020
88 Maharashtra Proposal for construction of part of 220 kv D/C Monopole Transmission Line from 35+900 (Wadkhal) to 53+500 (Nagothane) RHS along NHAI utility corridor (958.57 Kb application-pdf) 18-12-2020
89 Maharashtra NHAI-PIU-NSK- Widening of existing 2 lane carriageway to 4 lane carriageway configuration for Vadape - Gonde (Km 440.00 to Km 539.500) & Pimpalgaon-NashikGonde (Km. 380.000 to Km. 440.000} sections of NH-3 in the State of Maharashtra - Maharashtra Information Technology Corporation Ltd. (DIT Mantralaya) proposal for laying Telecom OFC in stretches from Km.435.800 to Km. 458.500 (Length 25.30 Km) on NH-3 (1.13 Mb application-pdf) 17-12-2020
90 Uttar Pradesh Proposal for NOC for overhead crossing of 400 KV D/C (Twin) Rosa - Badaun transmission line on NH-730C between Km. 49.000 to Km. 49.100 near village - Mirjapur, District - Sadar Shahjahanpur in the State of Uttar Pradesh (4.08 Mb application-pdf) 17-12-2020

Pages